Snap 2™

product image
  • product image

The patented Snap 2 transformer-rated meter panels come in 6, 8 or 13 terminal design, pre-wired to customer-approved test switch and color-coded wiring specs. Utilities save time and reduce costly field mistakes by allowing contractors to install an empty meter enclosure.

Utility personnel then take the pre-wired panel and snap it into place.

  • Pre-wired or unwired configurations available
  • Unwired version permits utility workers to wire indoors rather than in the field.