The patented Snap 2 transformer-rated meter panels come in 6, 8 or 13 terminal design, pre-wired to customer-approved test switch and color-coded wiring specs. Utilities save time and reduce costly field mistakes by allowing contractors to install an empty meter enclosure.
Utility personnel then take the pre-wired panel and snap it into place.
Pre-wired or unwired configurations available
Unwired version permits utility workers to wire indoors rather than in the field.